Work on post-Brexit lorry contraflow system in Kent will disrupt M20 for a year | The Guardian 13/01/2022 In Trade, UK “The Operation Brock system installed to manage expected traffic chaos after ‘Brexit’ will now itself cause a year of disruption.” https://www.theguardian.com/politics/2022/jan/13/work-on-post-brexit-lorry-contraflow-system-in-kent-will-disrupt-m20-for-a-year #Kent #local #Operation Brock #traffic chaos ‘It won’t be easy’: the European exporters battling Brexit bureaucracy | The Guardian Work on post-Brexit lorry contraflow system in Kent will disrupt M20 for a year Leave a Reply Cancel replyYou must be logged in to post a comment. Related Posts UK car production is at its weakest since 1956. And the industry is losing the electric-vehicle race | CNN Business Brexit exodus of EU workers has left UK with ‘costleaving’ crisis | iNews Rail, ferry and Eurotunnel passengers to Europe face border chaos in 2022, warn transport chiefs | Yahoo News/The Independent Brexit’s Feared Diplomatic Crises Have Begun | Bloomberg